Sort: Sort by…
08.11.2016
The LK Group was commissioned by Urban Splash to provide a remediation strategy for a sensitive brownfield site in Manchester city centre, situated adjacent to the river Irwell. The site […]
20.11.2016
The LK Group devised a management plan which comprised a combination of treatments. Designated Area A was subject to a ‘dig and dump’ operation. A semi-permeable membrane was installed post-excavation […]
21.11.2016
The LK Group was approached by Kier to provide a remediation strategy for a brownfield site in Bury prior to the construction of a Fire Training facility for the Fire […]
21.11.2016
Approximately 875m2 of Japanese Knotweed required remediation. Infestation which fell within development area was designated for excavation, whilst remaining areas would be subjected to a herbicide application.
21.11.2016
Taylor Wimpey took possession of a site on the banks of the river Forth with a number of environmental and contamination issues, one being a large infestation of Japanese Knotweed […]